Blog

P6 and M98: The Complete Guide to Smarter Projects and CNC Automation

Written by admin

Technology continues to change how professionals manage projects and manufacturing processes. Whether you’re planning a complex construction job or programming a precision CNC machine, the tools you use can decide your success.

Two such tools — p6 and M98 — have become essential in modern industries. Though they belong to different worlds, both focus on the same goals: efficiency, accuracy, and control.

1. What Is p6? A Deep Look into Modern Project Management

1.1 Introduction to Primavera p6

Primavera p6, often shortened to p6, is a professional project management tool developed by Oracle. It’s used by industries where tasks are complex, deadlines are tight, and precision is vital.

p6 helps project managers plan, execute, and monitor every step of a project. From creating schedules to tracking progress, p6 ensures that every resource is used effectively.

1.2 What Makes P6 Unique

Unlike simple task-tracking software, p6 is built for large-scale, multi-level projects. It handles thousands of activities and resources at once while maintaining real-time updates.

P6 provides:

  • Detailed Gantt charts
  • Critical Path Method (CPM) scheduling
  • Resource optimization tools
  • Baseline comparison features
  • Real-time collaboration and reporting

These features make it ideal for industries like construction, engineering, IT, and manufacturing.

2. Core Features of Primavera p6

2.1 Work Breakdown Structure (WBS)

The WBS divides large projects into smaller, manageable pieces. In p6, each part has a clear scope, owner, and deliverable — ensuring no task is forgotten.

2.2 Activity Relationships

P6 defines how tasks connect. You can create dependencies like:

  • Finish-to-Start (FS)
  • Start-to-Start (SS)
  • Finish-to-Finish (FF)

These relationships help determine the project’s critical path.

2.3 Resource Allocation

p6 tracks manpower, equipment, and materials. You can assign resources to activities and monitor utilization to prevent overloads or idle time.

2.4 Cost and Budget Tracking

Every activity can include cost codes, helping managers compare planned vs actual spending.

2.5 Baseline and Progress Measurement

Baselines help track how far the project has deviated from the original plan. With progress tracking, teams can make adjustments early.

3. Key Benefits of Using p6

3.1 Structured Planning

p6 ensures every detail is documented. Nothing is left to chance, which improves project reliability.

3.2 Time Management

The scheduling engine identifies which activities can delay the project and which can be fast-tracked.

3.3 Resource Efficiency

By balancing workloads and reducing idle time, p6 helps get the most out of every resource.

3.4 Budget Control

With real-time cost tracking, teams can stay within budget and forecast future spending.

3.5 Collaboration

p6 supports multi-user environments, allowing managers and team members to update tasks simultaneously.

4. Where Is p6 Used?

p6 is a versatile tool with applications across various industries:

  • Construction: For planning building projects and managing timelines.
  • Oil and Gas: To coordinate drilling, safety, and logistics.
  • Manufacturing: To schedule production lines and maintenance.
  • IT: For tracking software development and deployment.
  • Aerospace: To manage complex design and manufacturing processes.

Any industry that requires precise project scheduling can benefit from Primavera p6.

5. Introduction to M98 in CNC Programming

5.1 What Does M98 Mean?

In CNC (Computer Numerical Control) programming, M98 is a subprogram call command. It allows the main program to call another block of code, known as a subprogram.

For example:

M98 P1000 L3

  • P1000 = Subprogram number (O1000)
  • L3 = Repeat the subprogram three times

5.2 Why M98 Is Important

In CNC machining, many operations are repetitive. Instead of writing the same lines repeatedly, M98 lets you create reusable routines. This approach:

  • Reduces errors
  • Speeds up coding
  • Makes programs easier to read
  • Simplifies maintenance

6. How M98 Works in CNC Programming

Let’s break it down with an example.

Main Program (O0001):

O0001

G21 G90

M98 P2000 L4

M30

Subprogram (O2000):

O2000

G81 X10 Y10 Z-5 R1 F100

G80

M99

Here, the main program calls the subprogram O2000 four times (L4). The subprogram executes the same drilling pattern repeatedly, saving time and code length.

7. Benefits of M98 Command

7.1 Time Efficiency

Once written, subprograms can be reused in multiple parts or programs.

7.2 Clean Code

Main programs become shorter and easier to debug.

7.3 Flexibility

Changing one subprogram updates multiple parts of the process.

7.4 Consistency

Repetitive operations are always executed with the same accuracy.

8. Difference Between M98 and M99

  • M98 calls a subprogram.
  • M99 returns to the main program after executing the subprogram.

Together, they form a powerful loop structure for modular CNC code.

9. Comparing p6 and M98: Two Worlds, One Principle

While p6 manages projects and M98 controls machines, both follow the same logic — divide and conquer.

Aspectp6M98
PurposeProject ManagementCNC Programming
Core FunctionSchedule & Resource ControlSubprogram Execution
StructureTasks, WBS, DependenciesCode Blocks, Loops
EfficiencySaves project timeSaves programming time
ReusabilityTemplates, ActivitiesSubprograms

Both promote organized workflows and minimize human error through structured processes.

10. How p6 and M98 Improve Efficiency

10.1 Reducing Repetition

p6 avoids repeating tasks in planning. M98 avoids repeating code in CNC machining.

10.2 Enhancing Accuracy

Structured workflows reduce human mistakes in both systems.

10.3 Saving Time

Automation and standardization mean faster delivery of results.

10.4 Enabling Better Control

Both allow precise tracking — P6 tracks timelines, M98 tracks machining steps.

11. Case Studies: Real-World Scenarios

Case 1: p6 in Construction

A large infrastructure company uses p6 to coordinate multiple subcontractors. Each phase — design, excavation, concrete, finishing — is tracked in real time. Delays in one section automatically update all dependent activities, ensuring the team stays informed.

Case 2: M98 in CNC Manufacturing

A car parts manufacturer programs subprograms for drilling engine components. The M98 command saves hours of coding, ensures accuracy, and speeds up production.

12. Best Practices for p6

  1. Define a clear Work Breakdown Structure before starting.
  2. Update schedules frequently to reflect real progress.
  3. Assign realistic durations for each task.
  4. Monitor critical paths to avoid unexpected delays.
  5. Use p6 dashboards for clear communication with stakeholders.

13. Best Practices for M98

  1. Keep subprogram names and numbers consistent.
  2. Document every subprogram’s function.
  3. Avoid deep nesting (calling subprograms inside subprograms too often).
  4. Test subprograms independently before integration.
  5. Use comments in code for clarity.

14. Future of P6 and M98 in Automation

Both technologies continue to evolve with AI and cloud computing.

P6 Future Trends

  • Integration with BIM (Building Information Modeling)
  • AI-driven forecasting for risk and schedule optimization
  • Real-time analytics from IoT-enabled construction sites

M98 Future Trends

  • Smarter CNC controllers with AI-assisted programming
  • Digital twins for virtual machining tests
  • Enhanced automation with robotic integration

Together, they represent a future where planning and production work hand in hand, powered by data and precision.

15. Common Mistakes to Avoid

In p6:

  • Ignoring activity dependencies
  • Over-allocating resources
  • Not updating progress regularly
  • Skipping baseline setup

In M98:

  • Forgetting to include M99 at the end of a subprogram
  • Using incorrect subprogram numbers
  • Failing to test loops before full production

Avoiding these mistakes ensures both systems run smoothly.

16. Integration of Planning and Production

When companies use both project management tools (like P6) and automation systems (like CNC with M98), they achieve:

  • Seamless coordination between planning and manufacturing
  • Faster response to design changes
  • Improved quality control
  • Predictable outcomes

This integrated approach forms the backbone of Industry 4.0 — the era of smart manufacturing and digital transformation.

17. Conclusion

Both p6 and M98 symbolize the same mindset — structured efficiency.

  • p6 helps teams manage complex projects through scheduling and resource control.
  • M98 helps machine programmers automate repetitive machining tasks with subprograms.

When used correctly, both reduce errors, save time, and improve results. Whether you’re managing a construction project or writing CNC code, the principles behind p6 and M98 remind us that success comes from organization, precision, and smart execution.

About the author

admin

Leave a Comment